TM 5-5420-280-10
0047 00
BRIDGE MAINTENANCE PROCEDURES (Contd)
CROSSFORCE COUPLINGS, UPPER COUPLING LOCK PLUNGERS AND
1. Using clean rags and solvent, clean crossforce coupling bumper (2), upper
coupling lock plunger (3), lever (4), and lower coupling connector (1) and
receptacle (5), remote control lever (6), and needle cam follower (7) on four
2. Using clean rags, wipe dry all items cleaned with solvent in step 1 above.
3. Coat four crossforce couplings bumpers (2), upper coupling lock plunger
surface of remote control lever (6) with grease. Refer to items 4 and 5,
4. Notify field maintenance to grease bearing of four needle cam followers (7) at
grease fitting with grease. Refer to items 4 and 5, WP 0052 00.
5
7
~
2
3
6
4
1
0047 00-2