TM 5-5420-280-10
MAINTENANCE INSTRUCTIONS/PMCS
RAPIDLY EMPLACED BRIDGE (REB)
BRIDGE MAINTENANCE PROCEDURES
GENERAL
WARNING
Do not perform maintenance on equipment while in
operation. Do not allow vehicles on bridge while
performing operator maintenance. Failure to comply
may result in injury or death to personnel or damage to
equipment.
This section contains operator's level maintenance procedures for the bridge.
For operator's level maintenance procedures for the CBT, refer to
TM 5-5420-234-14&P. Perform all procedures in the order of the steps provided.
Notify your supervisor if you cannot perform a maintenance procedure due to
wear, damage, or missing parts. Refer to WP 0045 00, tables 1, 2, and 3 for
LAUNCH BEAM
1. Using clean rags and solvent, clean pinwheel drive pins (2), rack (3), and rails (1).
2. Using clean rags, wipe dry pins (2), rack (3), and rails (1).
3. Coat all pins (2) and rack (3) with grease. Refer to items 4 and 5, WP 0052 00.
4. Coat rails (1) on both sides of launch beam with grease. Refer to items 4 and
1
2
1
3