TM 5-5420-280-23&P
0055 00
NATO SLAVE RECEPTACLE REPLACEMENT (Contd)
REMOVAL
WARNING
Ensure battery ground cable is disconnected or damage to
equipment or injury to personnel may result.
NOTE
Tag all electrical cables and terminals for installation.
1.
Remove screw (7), lockwasher (8), and Launch Power Unit (LPU) starter positive cable (9) from top
terminal (5) of NATO slave receptacle (4). Discard lockwasher (8).
2.
Remove screw (7), lockwasher (8), and main power switch negative jumper cable (10) from bottom
terminal (13) of NATO slave receptacle (4). Discard lockwasher (8).
3.
Remove four nuts (11), screws (1), washers (2), lanyard (14) with attached cover (3), NATO slave
receptacle (4), and gasket (6) from pallet frame (12). Discard gasket (6).
INSTALLATION
1. Install NATO slave receptacle (4) on pallet frame (12) with new gasket (6), lanyard (14) with
attached cover (3), four washers (2), screws (1), and nuts (11).
2.
Connect main power switch negative jumper cable (10) on bottom terminal (13) of NATO slave
receptacle (4) with new lockwasher (8) and screw (7).
3.
Connect LPU starter positive cable (9) to top terminal (5) with new lockwasher (8) and screw (7).
4.
5.
Install bridge halves on bridge pallet. Refer to WP 0018 00.
0055 00-2