TM 5-5420-280-23&P
PALLET MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NATO SLAVE RECEPTACLE REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Bridge halves removed from bridge pallet.
(Table 1, Item 2, WP 0207 00)
Battery ground cable disconnected.
Materials/Parts