TM 5-5420-280-23&P
BRIDGE MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
BRIDGE HALF REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Forward Repair System (FRS)
Four
Equipment Condition
Lifting device
Unload pallet to ground. Refer to
Chains or cables
TM 5-5420-280-10.
Dunnage
Bridge fastening rods removed. Refer to
TM 5-5420-280-10.
Materials/Parts