• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BRIDGE SLIDE LOCK MECHANISM REPLACEMENT - Continued
LAUNCH BEAM LIFTING EYE AND SWIVEL BLOCKS REPLACEMENT - Continued

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  235    236    237    238    239  240  241    242    243    244    245  
img
. . . . .
TM 5-5420-280-23&P
0027 00
BRIDGE MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
LAUNCH BEAM LIFTING EYE AND SWIVEL BLOCKS REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Winch cable disconnected if top bridge half
Forward Repair System (FRS)
lifting eye is to be replaced.
(Table 1, Item 2, WP 0206 00)
Refer to TM 5-5420-280-10.
Materials/Parts
Grease (Item 8, WP 0205 00)
Two locking tabs (WP 0142 00)
0027 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.