• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BRIDGE UPPER COUPLING LOCK LEVER, RECEPTACLE, AND LOCKING MECHANISM MAINTENANCE - Continued
BRIDGE CROSSFORCE COUPLING BUMPERS REPLACEMENT - Continued

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  230    231    232    233    234  235  236    237    238    239    240  
img
. . . . .
TM 5-5420-280-23&P
0025 00
BRIDGE MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
BRIDGE CROSSFORCE COUPLING BUMPERS REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Materials/Parts
Forward Repair System (FRS)
Unlike metal compound (Item 23, WP 0205 00)
(Table 1, Item 2, WP 0206 00)
Six lockwashers (WP 0140 00)
0025 00-1
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.