• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PIN WHEEL DRIVE ASSEMBLY REPLACEMENT - Continued
PIN WHEEL DRIVE GEAR REPLACEMENT - Continued

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  456    457    458    459    460  461  462    463    464    465    466  
img
. . . . .
TM 5-5420-280-23&P
0083 00
LAUNCHER MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
PIN WHEEL DRIVE GEAR REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Bridge halves removed from bridge pallet for
(Table 1, Item 2, WP 0206 00)
front pin wheel drive gear.
Refer to WP 0018 00.
Materials/Parts
Sealing compound (242) (Item 16, WP 0205 00)
0083 00-1
Change 1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.