• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECONDARY BOOM CYLINDER REPLACEMENT - Continued
SECONDARY BOOM REPLACEMENT - Continued

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  511    512    513    514    515  516  517    518    519    520    521  
img
. . . . . . .
TM 5-5420-280-23&P
0100 00
LAUNCHER MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
NSN 5420-01-481-3959 P/N 12480471
SECONDARY BOOM REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Equipment Condition
Tools and Special Tools
Bridge halves removed from bridge pallet.
Forward Repair System (FRS)
Refer to WP 0018 00.
(Table 1, Item 2, WP 0206 00)
Materials/Parts
Grease (Item 8, WP 0205 00)
Four locknuts (WP 0157 00)
Four locknuts (WP 0185 00)
0100 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.