TM 55-1945-205-10-20039 00 120039 00:,1*17. Using forklift and forklift adaptor, lift anchor (17) by tag lines between padeye crown (44) and shackle foot (45).18. Position anchor (17) on drawer (41).19. Remove aluminum wedge (43).20. Stow aluminum wedge (43) in toolbox.21. Remove tag lines from anchor (17).22. Retract the anchor drawer (41) by pumping the extend/retract pump (42) with the control valve in the retract position (handle to the left).23. Install the 6 ton chain hoists (46) to secure the anchor drawer (41) to the container frame.17414646
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business