TM 55-1945-205-10-2
0039 00 16
0039 00
:,1*
127(
The mooring line should be completely dry before placement in the mooring box.
28. Lay the mooring line (3) in the mooring box (50) leaving approximately 55 feet of mooring line (3) out of
the box (50).
:,1*
29. Using forklift and forklift adaptor, lay the anchor chain (14) in the mooring box (50) on top of the mooring line (3).
:,1*
30. Using a forklift, install the mooring box (50) in the container.
31. Pull anchor chain (14) out anchor end of container.
32. Double the anchor chain (14) over the anchor (17).
33. Tie the anchor chain (14) to the anchor crown padeye with #6 thread twine.
34. Tie the anchor links together in three places with #6 twine to prevent the anchor chain (17) from falling behind
the anchor drawer (41).
:,1*
35. Pull the mooring line (3) out through the anchor end of the container.
36. Tie the mooring line (3) to the upper container frame on the left side in four places with #6 thread twine.