TM 55-1945-205-10-2
0042 00 1
0042 00
OPERATOR MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
FENDERS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0121 00)
Life Preserver, Vest (Item 33, WP 0119 00)
Gloves, Mens and Womens (Leather Palm) (Item 25, WP 0119 00)
Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00)
Helmet, Safety (Item 29, WP 0119 00)
Personnel Required
Seaman 88K
PREPARATION FOR MOVEMENT - REMOVAL OF FENDERS
REMOVE FENDERS
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
127(
In the event it is necessary to place fender on deck of the RRDF, it must be chocked to
prevent uncontrolled movement.
1.
Remove 6 ft x 12 ft fenders.