TM 55-1945-205-10-2
0040 00 2
0040 00
2.
Detach power cable (1) from personnel shelter power receptacle (2).
3.
Remove ground cable.
a.
Detach ground cable C-Clamp (3) from module ISO fitting (4).
b.
Remove nut (5), lock washer (6) and flat washer (7) from personnel shelter ground stud (8).
c.
Remove ground cable (9) from personnel shelter ground stud (8).
d.
Install flat washer (7), lock washer (6) and nut (5) on ground stud (8).
e.
Tighten nut (5) securely.
4.
Close exterior hinged cover of the electrical shore tie and secure.
5.
Remove tiedown straps securing personnel shelter to RRDF platform.
6.
Lift personnel shelter from RRDF platform.
END OF WORK PACKAGE