TM 55-1945-205-10-4
0013 00 1
0013 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
COMBINATION BEACH/SEA END SECTION
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Crowbar (Item 14, WP 0104 00)
Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)
Personnel Required
Seaman 88K
Equipment Condition
Module ISOPAK Disassembled. (WP 0008 00)
Operation of Male And Female Guillotine Connectors. (WP 0009 00)
D-Ring/Cloverleaf Fittings And Deck Cleat Fittings Installed. (WP 0010 00)
Module String Assembled. (WP 0011 00)
PREPARATION FOR USE - ASSEMBLY COMBINATION BEACH/SEA END SECTION
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
ASSEMBLE COMBINATION BEACH/SEA END SECTION DECK OF SEALIFT VESSEL
1. Position module string (1) so that female connectors (2) align with male connectors (3) on the other
module strings (1).
3
2
1