TM 55-1945-205-10-40012 00 60012 00127(This step is typical for both two leg bridle slings.b.Install two leg bridle sling (18) on spreader beam (13).{1} Remove nut (19) and washer (20) from shackle bolt (21).{2} Remove bolt (21) and washer (22) from 55 ton shackle (23).{3} Insert two leg bridle sling master link (24) on shackle (23).{4} Align holes in shackle (23) with hole on bottom of spreader beam (13).{5} Install shackle bolt (21) and washer (22) through shackle (23) and spreader beam (13).{6} Install washer (20) and nut (19) on bolt (21).{7} Tighten nut (19).127(This step is typical for all four attachment points.c.Attach spreader beam (13) to intermediate module (11).{1} Remove shackle pin (25) from 35 ton shackle (26).{2} Install two leg bridle sling thimble (27) on shackle (26).{3} Insert shackle (26) through intermediate section lifting lug (28).{4} Install shackle pin (25) in shackle (26).:,1*d.Using crane, lift intermediate section (11) and place in water.END OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business