TM 55-1945-10-40014 00 10014 00OPERATOR MAINTENANCEFLOATING CAUSEWAYTRIDENT PIERHEAD/EXTENSIONOPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and Women’s (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Crowbar (Item 14, WP 0104 00)Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)Personnel RequiredSeaman 88KEquipment ConditionModule ISOPAK Disassembled. (WP 0008 00)Operation Of Male And Female Guillotine Connectors. (WP 0009 00)D-Rings/Cloverleaf Fittings And Deck Cleat Fitting Installed. (WP 0010 00)Module String Assembled. (WP 0011 00)Intermediate Section Assembled. (WP 0012 00)PREPARATION FOR USE - ASSEMBLY OF TRIDENT PIERHEAD/EXTENSIONASSEMBLE TRIDENT PIERHEAD:,1*All personnel must wear a personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. failure to observe these precautions could result in serious injury or death to personnel.1.Assemble ten intermediate sections.:,1*Place the hands on top or on the outside of ropes/lines so that in an emergency the lines can be released quickly to preclude being pulled into the equipment. Failure to observe these precautions could result in serious injury or death.2.Assemble two, five intermediate sections together side by side, using rope/lines, flush turn tubes, deck cleats, and warping tug so that the tapered surfaces of male and female connectors mate together in general alignment.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business