TM 55-1945-205-10-40034 00 70034 00b.Pull latch pin (18) and open latch (19).c.Raise carpenter stop cover (20) open.d.Withdraw wedge (21) as far as possible from carpenter stop (13).e.Lay mooring line (7) in wedge (21).f.Close cover (20).g.Close latch (19) and secure by inserting latch pin (18).h.Hammer wedge (21) into carpenter stop (13), clamping mooring line (7).DEPLOY ASSEMBLED ONSHORE ANCHORS1.Manually or using a bulldozer, excavate a depression in sand where anchors are to be stored.:,1*2.Using two onshore personnel, lift anchors (11) by stabilizers (22) until lower fluke (23) drops down pointing into sand depression.21181920713
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business