TM 55-1945-205-10-4
0038 00 2
0038 00
2.
Detach power cable (1) from personnel shelter power receptacle (2).
3.
Remove ground cable.
a.
Detach ground cable C-Clamp (3) from module ISO fitting (4).
b.
Remove nut (5), lock washer (6) and flat washer (7) from personnel shelter ground stud (8).
c.
Remove ground cable (9) from personnel shelter ground stud (8).
d.
Install flat washer (7), lock washer (6) and nut (5) on ground stud (8).
e.
Tighten nut (5).
4.
Close exterior hinged cover of the electrical shore tie and secure.
5.
Remove tiedown straps securing personnel shelter container to FC platform.
:,1*
6.
Using crane, lift personnel shelter container from FC platform.
END OF WORK PACKAGE
3
4
9
8
5
6
7
1
2