TM 55-1945-205-10-4
0039 00 1
0039 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
GENERATOR CONTAINER
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Personnel Required
Seaman 88K
PREPARATION FOR MOVEMENT - REMOVAL OF GENERATOR CONTAINER
REMOVE GENERATOR CONTAINER EXHAUST PIPE
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
1.
Retrieve louver covers (1) from container.