TM 55-1945-205-10-4
0047 00 1
0047 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Crowbar (Item 14, WP 0104 00)
Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)
Personnel Required
Seaman 88K
Equipment Condition
Dunnage Mats Removed. (WP 0036 00)
Light Towers Removed. (WP 0037 00)
Personnel Shelter Container Removed. (WP 0038 00)
Tactical Quiet Generator Container Removed. (WP 0039 00)
Fenders Removed. (WP 0040 00)
Safety Equipment Removed. (WP 0041 00)
Towing Bridle, Towing Interface And Towing Lights Removed. (WP 0042 00)
Mooring Bitts Removed. (WP 0043 00)
D-Ring/Cloverleaf And Deck Cleat Fittings Removed. (WP 0044 00)
Recover Onshore Anchor Mooring Legs. (WP 0045 00)
Recover Offshore Anchor Mooring Legs. (WP 0046 00)
PREPARATION FOR MOVEMENT - DISASSEMBLY OF CAUSEWAY
DISASSEMBLE CAUSEWAY
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
Place the hands on top or on the outside of ropes and lines so that in an emergency
the lines can be released quickly to preclude being pulled into the equipment. Failure
to observe these precautions could result in serious injury or death.
1.
Disassemble causeway from trident pierhead using warping tugs, ropes/lines, flush turn tubes and lift lugs.