TM 55-1945-205-10-4
0047 00 5/6 blank
0047 00
5.
Using warping tugs separate causeway into intermediate sections.
6.
Repeat step 2 and 3.
7.
Untie line securing intermediate sections together.
8.
Separate intermediate sections. (WP 0050 00)
DISASSEMBLE FORCE OPENING FLOATING CAUSEWAY
1.
Disassemble causeway from pierhead using warping tugs, ropes/lines, flush turn tubes and lift lugs.
2.
Repeat steps 2 and 3.
3.
Untie lines securing causeway to pierhead segments together.
4.
Repeat steps 1 through 8 and disassemble causeway.
5.
Disassemble pierhead. (WP 0048 00)
END OF WORK PACKAGE
CAUSEW AY SEGM ENT
INTERM EDIATE
SECTIO NS
BEACH/SEA END
SECTIO N
PIER HEAD
CAUSEW AY W ITH
BEACH/SEA END