TM 55-1945-205-10-4
0099 00 15
0099 00
5
Before
.2
Onshore Anchor
Container
1. Check exterior of container
for damage. If damage is found,
contact unit maintenance.
6
Before
.5
Onshore Mooring
System
2. Check cables to ensure that the
ends are securely attached. Check
cables for fraying and other damage.
If cable ends are not securely
attached or cables are frayed,
contact unit maintenance.
a. Check cables for elongation or
broken strands. If cable
elongation or broken strand are
found, contact unit maintenance.
b. Check cable thimbles and
swage fittings for cracking and
corrosion. If cable thimbles or
swage fittings are cracked or
corroded, contact unit
maintenance.
2. Check for damage to anchor
system components. If anchor
system components are damaged,
contact unit maintenance.
Table 1. Preventive Maintenance Checks and Services. (Continued)
ITEM
NO.
INTERVAL
MAN-
HOURS
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
ONSHORE LEG ASSEMBLY
FITS IN
GUILLOTINE
HORIZONTAL
FITTING
ON-SHORE
HORIZONTAL
PADEYE
WIRE ROPE
CARPENTER STOP
SNATCH BLOCK
CARPENTER STOP
GRIP HOIST
MASTER LINK
ANCHORS
ANCHOR BRIDLE
FLOUNDER PLATES
SHACKLES