TM 55-1945-205-10-40099 00 150099 005 Before .2 Onshore AnchorContainer1. Check exterior of containerfor damage. If damage is found,contact unit maintenance.6 Before .5 Onshore MooringSystem2. Check cables to ensure that theends are securely attached. Checkcables for fraying and other damage.If cable ends are not securelyattached or cables are frayed,contact unit maintenance.a. Check cables for elongation orbroken strands. If cableelongation or broken strand arefound, contact unit maintenance.b. Check cable thimbles andswage fittings for cracking andcorrosion. If cable thimbles orswage fittings are cracked orcorroded, contact unitmaintenance.2. Check for damage to anchorsystem components. If anchorsystem components are damaged,contact unit maintenance.Table 1. Preventive Maintenance Checks and Services. (Continued)ITEMNO.INTERVALMAN-HOURSITEM TO BECHECKED ORSERVICEDPROCEDUREEQUIPMENTNOT READY/AVAILABLE IF:ONSHORE LEG ASSEMBLYFITS INGUILLOTINEHORIZONTALFITTINGON-SHOREHORIZONTALPADEYEWIRE ROPECARPENTER STOPSNATCH BLOCKCARPENTER STOPGRIP HOISTMASTER LINKANCHORSANCHOR BRIDLEFLOUNDER PLATESSHACKLES
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business