TM 55-1945-205-10-40099 00 460099 00WARNING8 After 1.5 Offshore AnchorMooring System(Cont’d)a. Coat and preserve all shacklebolts and stabilizer arm boltswith Antiseize Compound.WARNINGb. Coat the opening in the anchorshank and the trunnion bearingsurface withantiseize compound.15 After .2 Stanchions and LifeRings1. Check life rings for damage. Ifdamage is found that would preventproper operation of life rings,contact unit maintenance.2. Check life ring strobes forproper operation. If strobes do notoperate, contact unit maintenance.Table 1. Preventive Maintenance Checks and Services. (Continued)ITEMNO.INTERVALMAN-HOURSITEM TO BECHECKED ORSERVICEDPROCEDUREEQUIPMENTNOT READY/AVAILABLE IF:
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business