TM 55-1945-205-10-4
0011 00 1
0011 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
MODULE STRINGS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Crowbar (Item 14, WP 0104 00)
Hammer, Hand (10 lb Sledge) (Item 26,3 WP 0104 00)
Personnel Required
Seaman 88K
Equipment Condition
Module ISOPAK Disassembled (WP 0008 00)
Operation Of Male And Female Guillotine Connectors (WP 0009 00)
PREPARATION FOR USE - ASSEMBLY OF MODULE STRINGS
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
127(
Ensure that end rake modules and center module are completely aligned before locking
the guillotine connectors.
1.
Align male (1) and female (2) connectors on end rake module with connectors on center module.