TM 55-1945-205-10-40012 00 10012 00OPERATOR MAINTENANCEFLOATING CAUSEWAYINTERMEDIATE SECTIONOPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and Women’s (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Crowbar (Item 14, WP 0104 00)Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)30 Ton 1 ½ in. Anchor Bolt Shackle (Item 3, WP 0104 00)Personnel RequiredSeaman 88KEquipment ConditionModule ISOPAK Disassembled. (WP 0008 00)Operation Of Male And Female Guillotine Connectors. (WP 0009 00)D-Rings/Cloverleaf Fittings And Deck Cleat Fittings Installed. (WP 0010 00)Module String Assembled. (WP 0011 00)PREPARATION FOR USE - ASSEMBLY OF INTERMEDIATE SECTION:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.Place the hands on top or on the outside of ropes/lines so that in an emergency the lines can be released quickly to preclude being pulled into the equipment. Failure to observe these precautions could result in serious injury or death.127(Utilize fenders when bringing strings along side.1.Pull strings together using rope/lines.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business