Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSPECT INTERMEDIATE SECTION NON-POWERED MODULE FOR WATER (cont)
PRESSURE TEST INTERMEDIATE SECTION NON-POWERED MODULE - TM-55-1945-205-24-2_196
TM-55-1945-205-24-2 Modular Causeway System (MCS) Roll-On/Roll-Off Discharge Facility Model (RRDF) RRDF-1 NSN 1945-01-473-2282 Manual
Page Navigation
136
137
138
139
140
141
142
143
144
145
146
TM 55-1945-205-24-2
0057 00 1
0057 00
UNIT LEVEL MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
INTERMEDIATE SECTION NON-POWERED MODULE
INSPECTION FOR WATER
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 82, WP 0359 00)
Gloves, Chemical (Item 25, WP 0359 00)
Goggles, Industrial (Chipping, Chemical) (Item 28, WP 0359 00)
Sling, 53,000 lbs (Brown) (Item 69, WP 0359 00)
Socket Wrench Set (Item 92, WP 0359 00)
Socket, Socket Wrench (Item 93, WP 0359 00)
Key, Socket Head Screw (Allen Wrench) (Item 94, WP 0359 00)
Materials/Parts
Antiseize Compound (Item 4, WP 0358 00)
Personnel Required
Seaman 88K
Equipment Condition
Intermediate Section Non-Powered Module Dry-Docked.
PRESSURE TEST INTERMEDIATE SECTION NON-POWERED MODULE
NOTE
The following procedure is typical for pressure testing all non-powered modules and
for pipe plug location.
1. Remove test set (1), sensing line (2) and charging line extension hose (3) from storage box.
2. Attach two extension legs (4).
9
6
5
3
13
7
15
8
14
2
12
11
10
AIR SUPPLY
4
1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business