TM 55-1945-205-24-20095 00 10095 00UNIT LEVEL MAINTENANCEROLL-ON/ROLL-OFF DISCHARGE FACILITYPERSONNEL SHELTER EXTERIOR DOORREPLACEMENTINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 82, WP 0359 00)Gloves, Men’s and Women’s (Leather Palm) (Item 27, WP 0359 00)Goggles, Sun, Wind and Dust (Safety) (Item 29, WP 0359 00) Helmet, Safety (Brown) (Item 33, WP 0359 00)Life Preserver, Vest (Item 38, WP 0359 00)Materials/PartsDoor, Weathertight(06101)PN FC-621-001-2Personnel RequiredEngineer 88L (2)Equipment ConditionPersonnel Shelter Exterior Door Hasp Removed. (WP 0094 00)REMOVE PERSONNEL SHELTER EXTERIOR DOORWARNINGAll personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death.NOTEThe hinges will remain on the door frame during door replacement.1.Using assistant to support weight of door (1), remove four screws (2) on each of three door hinges (3) on door side.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business