TM 55-1945-205-24-2
0093 00 1
0093 00
UNIT LEVEL MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
PERSONNEL SHELTER INTERIOR DOOR
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 82, WP 0359 00)
Gloves, Mens and Womens (Leather Palm) (Item 27, WP 0359 00)
Goggles, Sun, Wind and Dust (Safety) (Item 29, WP 0359 00)
Helmet, Safety (Brown) (Item 33, WP 0359 00)
Life Preserver, Vest (Item 38, WP 0359 00)
Materials/Parts
Door, Interior
(81340)
PN FC-621-001-4
Personnel Required
Engineer 88L (2)
REMOVE PERSONNEL SHELTER INTERIOR DOOR
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
NOTE
The door hinges will remain on the door frame during door replacement.
1.
Remove four screws (1) securing hydraulic actuator (2) to door (3).
3
1
2
4
5