TM 55-1945-205-24-20098 00 20098 002.Inside personnel shelter, remove four screws (3) from shore tie junction box cover (4).3.Remove shore tie junction box cover (4) from junction box (5).4.Rotate stuffing tube packing retainer cap (6) counterclockwise and slide away from nylon stuffing tube (7).5.Slide plastic packing washers (8) and stuffing tube packing (9) away from nylon stuffing tube (7).NOTEDue to mounting arrangement of personnel shelter shore tie male connector, two persons will be required to perform this step.6.Remove four nuts (10) from junction box (5).7.Remove four screws (11) and plastic washers (12) from personnel shelter shore tie male connector (2).8.Pull personnel shelter shore tie male connector (2) outward from shore tie recess pocket (13).9.Loosen five screws (14) on back of personnel shelter shore tie male connector (2).6534107982141114111515131212
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business