TM 55-1945-205-24-2
0101 00 1
0101 00
UNIT LEVEL MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
HEATING AND AIR CONDITIONING SYSTEM CHASSIS
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 82, WP 0359 00)
Personnel Required
Engineer 88L (2)
Equipment Condition
Heating And Air Conditioning System Front Cover Removed. (WP 0099 00)
Heating And Air Conditioning System Indoor Air Filter Removed. (WP 0100 00)
REMOVE HEATING AND AIR CONDITIONING SYSTEM CHASSIS
1.
Switch mode selector switch (1) to OFF position.
2.
Open CKT A HEAT PUMP circuit breaker (2) in shelter electrical distribution panel (3).
3.
Remove screw (4) from access cover (5).
4.
Remove access cover (5).
2
CKT A
HEAT PUMP
208VAC, 1PH, 60HZ
FDR (SHLTR PNL)-2P-A
CKT C
OVERHEAD LTG
120VAC, 1PH, 60HZ
FDR (SHLTR PNL)-1L-C(1)
CKT E
CHARGER RCPT
120VAC, 1PH, 60HZ
FDR (SHLTR PNL)-1P-E
CKT B
RECEPTACLES
120VAC, 1PH, 60HZ
FDR (SHLTR PNL)-1P-B(1)
CKT D
TOILET LTG & VENT
120VAC, 1PH, 60HZ
FDR (SHLTR PNL)-1L-D(1)
INCINOLET TOILET
CKT F
208VAC, 1PH, 60HZ
FDR (SHLTR PNL)-2P-A
- 60 - 70 - 80 - 90 -
ON AUTO
COOL OFF HEAT
FAN
1
3
4
5