TM 55-1945-205-24-2
0188 00 3/4 blank
0188 00
INSTALL LIGHT TOWER ENGINE RADIATOR RESERVE TANK
1.
Position new reserve tank (1) on rear panel (7).
2.
Install two hex head bolts (5) and hex nuts (6) through reserve tank (1) on rear panel (7).
3.
Install hose (4) on the bottom of reserve tank (1).
4.
Slide hose clamp (3) back into position on hose (4). Tighten hose clamp (3).
5.
Replace light tower engine radiator coolant. (WP 0178 00)
6.
Install radiator cap (2).
WARNING
7.
Clean up spilled fluid with a spill kit and dispose of spill kit waste in accordance with local procedures.
8.
Install light tower battery negative lead terminal. (WP 0134 00)
END OF WORK PACKAGE