TM 55-1945-205-24-20193 00 10193 00UNIT LEVEL MAINTENANCEROLL-ON/ROLL-OFF DISCHARGE FACILITYLIGHT TOWER RUNNING GEAR WHEEL HUBREMOVAL AND INSTALLATIONINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 82, WP 0359 00)Gloves, Men’s and Women’s (Leather Palm) (Item 27, WP 0359 00)Goggles, Sun, Wind and Dust (Safety) (Item 29, WP 0359 00)Helmet, Safety (Brown) (Item 33, WP 0359 00)Life Preserver, Vest (Item 38, WP 0359 00)Wrench, Torque (150-750 in. lbs) (Item 91, WP 0359 00)Materials/PartsPin, Cotter(33968)PN 35315225Seal(33968)PN 35315142Personnel RequiredEngineer 88LEquipment ConditionLight Tower Running Gear Wheel and Tire Assembly Removed. (WP 0192 00)REMOVE LIGHT TOWER RUNNING GEAR WHEEL HUBWARNINGAll personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death.NOTEThe following procedure is typical for the removal and installation of port and starboard light tower wheel hubs.1.Remove dust cap (1) from hub (2).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business