Home
Download PDF
Order CD-ROM
Order in Print
INSTALL LIGHT TOWER RAISE/LOWER WINCH - TM-55-1945-205-24-2_624
INSTALL LIGHT TOWER DRAWBAR JACK - TM-55-1945-205-24-2_626
TM-55-1945-205-24-2 Modular Causeway System (MCS) Roll-On/Roll-Off Discharge Facility Model (RRDF) RRDF-1 NSN 1945-01-473-2282 Manual
Page Navigation
507
508
509
510
511
512
513
514
515
516
517
TM 55-1945-205-24-2
0203 00 1
0203 00
UNIT LEVEL MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
LIGHT TOWER DRAWBAR JACK
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 82, WP 0359 00)
Gloves, Men’s and Women’s (Leather Palm) (Item 27, WP 0359 00)
Goggles, Sun, Wind and Dust (Safety) (Item 29, WP 0359 00)
Helmet, Safety (Brown) (Item 33, WP 0359 00)
Life Preserver, Vest (Item 38, WP 0359 00)
Pliers, Retaining Ring (Item 47, WP 0359 00)
Materials/Parts
Ring, Snap
(33968)
PN 36780039
Jack, Drawbar
(33968)
PN 36848455
Personnel Required
Engineer 88L
REMOVE LIGHT TOWER DRAWBAR JACK
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
1.
Using retaining ring pliers, remove ring (1) releasing drawbar jack (2) from drawbar (3).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business