Home
Download PDF
Order CD-ROM
Order in Print
LIGHT TOWER - TOWER ASSEMBLY - TM-55-1945-205-24-2_647
INSTALL LIGHT TOWER - TOWER ASSEMBLY - TM-55-1945-205-24-2_649
TM-55-1945-205-24-2 Modular Causeway System (MCS) Roll-On/Roll-Off Discharge Facility Model (RRDF) RRDF-1 NSN 1945-01-473-2282 Manual
Page Navigation
527
528
529
530
531
532
533
534
535
536
537
TM 55-1945-205-24-2
0211 00 2
0211 00
2.
Remove tower rest retaining pin (4) from tower rest (5).
3.
Attach sling and shackles to lift points (6) on tower assembly (7).
WARNING
4.
Using crane and sling to support weight of tower assembly (7), remove pivot pin (3) from tower support (8) and
tower pivot support (9).
WARNING
5.
Remove tower assembly (7) and place on wooden blocks.
6.
Remove sling from tower assembly (7).
7.
Remove light tower - tower cross bar. (WP 0214 00)
8.
Remove light tower - tower electrical cable shroud. (WP 0215 00)
9.
Remove light tower electrical system
junction box
electrical cable. (WP 0136 00)
10. Remove light tower pivot support (9). (WP 0209 00)
9
4
2
3
1
8
5
7
6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business