TM 55-1945-205-24-2
0212 00 1
0212 00
DIRECT SUPPORT MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE ASSEMBLY
LIGHT TOWER - TOWER ASSEMBLY TRUNNION
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Item 81, WP 0359 00)
Gloves, Mens and Womens (Leather Palm) (Item 27, WP 0359 00)
Goggles, Sun, Wind and Dust (Safety) (Item 29, WP 0359 00)
Helmet, Safety (Brown) (Item 33, WP 0359 00)
Life Preserver, Vest (Item 38, WP 0359 00)
Materials/Parts
Trunnion
(33968)
PN 36885457
Personnel Required
Engineer 88L
Equipment Condition
Light Tower Battery Negative Lead Terminal Removed. (WP 0134 00)
Light Tower Optical/Socket Assembly Removed. (WP 0157 00)
REMOVE LIGHT TOWER - TOWER ASSEMBLY TRUNNION
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during RRDF operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
1.
Remove nut (1) and bolt (2) on support bar (3).