TM 55 1945-205-24-20256 00 50256 00WARNINGNOTEVerify that nothing will prevent the free movement of chain and mooring line.3.Using forklift, install mooring box (14) in container (15).4.Install four ratchet straps (13).WARNING5.Pull excess anchor chain (7) through opening between mooring box (14) and anchor (8).6.Lay chain (7) on anchor (8).7.Tie anchor chain (7) links together (three places) with twine.8.Tie anchor chain (7) to anchor (8) with twine.9.Pull excess mooring line (11) through opening between mooring box (14) and anchor (8).10. Tie mooring line (11) to launch frame (12 (four places).11. Remove pin (9) from shackle (10).12. Position shackle (10) on mooring line (11).13. Install pin (9) in shackle (10).14. Remove cotter pin (3), nut (4) and bolt (5) from shackle (6).15. Position shackle (6) on chain (7).16. Install bolt (5), nut (4) and cotter pin (3) in shackle (6).17. Remove locking hooks to close pump side doors (2).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business