TM 55-1945-205-24-2
0296 00 5/6 blank
0296 00
5.
Connect throttle control cable (10) to the engine. (WP 0267 00)
6.
Connect three plugs (6) of primary electrical wire bundle (7) on engine (2).
7.
Install positive (4) and negative (5) battery leads to engine (2).
8.
Install two bolts (8) and retaining plate (9) to front of engine (2).
9.
Install oil hose (3) on side of engine (2) and tighten hose clamp.
10. Depress spring flange and install fuel hose (1) on the side of engine (2).
11. Install RHIB steering cylinder. (WP 0262 00)
12. Install RHIB power steering system hoses. (WP 0261 00)
13. Install RHIB engine cover. (WP 0297 00)
14. Install RHIB battery negative lead terminal. (WP 0336 00)
15. Perform operational check of RHIB. (TM 55-1945-205-10-2)
END OF WORK PACKAGE