TM55-1945-205-24-2
0315 00 3/4 blank
0315 00
INSTALL RHIB ENGINE CARBURETOR
1.
Install three new carburetor gaskets (9) on studs (8).
2.
Position carburetors (3) on studs (8).
3.
Install six lock washers (7) and hex nuts (6) on studs (8) to secure carburetors (3) to the studs (8).
Tighten hex nuts (6).
4.
Install linkages (5) on carburetors (3).
5.
Install retainers (4) on linkages (5).
6.
Connect fuel hoses (2) to carburetors (3).
WARNING
7.
Clean up spilled fluid with spill kit and dispose of spill kit waste in accordance with local procedures.
8.
Install new fuel hose tiedown straps (1).
9.
Install RHIB engine air silencer. (WP 0314 00)
10. Adjust RHIB engine throttle synchronization and linkage. (WP 0271 00)
11. Adjust RHIB engine carburetor fuel mixture. (WP 0317 00)
12. Install RHIB engine cover. (WP 0297 00)
13. Install RHIB battery negative lead terminal. (WP 0336 00)
14. Perform operational check of RHIB. (TM 55-1945-205-10-2)
END OF WORK PACKAGE