TM 55-1945-205-24-4
0056 00 1/2 blank
0056 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
INTERMEDIATE SECTION NON-POWERED MODULE
FLEXOR ASSEMBLY
INSPECTION
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Personnel Required
Seaman 88K
INSPECT INTERMEDIATE SECTION NON-POWERED MODULE FLEXOR ASSEMBLY
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
NOTE
The following procedure is typical for all flexors.
1.
Inspect uninstalled flexors (1) for separation of the polyurethane material (2) in the center. If, found replace
flexor (1).
2.
Inspect uninstalled flexors (1) for cracks in the external weldments (3) on the ends. If found, replace flexor (1).
3.
Inspect installed flexors (1) for separation of the polyurethane material (2) in the center. If found, replace
flexor (1) after the exercise or operation is completed.
4.
Inspect installed flexors (1) for cracks in the external weldments (3) on the ends. If found, replace flexor (1).
END OF WORK PACKAGE