Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALL LIGHT TOWER BALLAST - TM-55-1945-205-24-4_476
LIGHT TOWER CONTROL BOX PANEL - TM-55-1945-205-24-4_479
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
374
375
376
377
378
379
380
381
382
383
384
TM 55-1945-205-24-4
0159 00 3/4 blank
0159 00
5.
Connect wires (1) to capacitor (3) and
ballast
(2) and remove tags.
6.
Install light tower ballast box cover. (WP 0158 00)
7.
Install light tower
ballast
box panel end. (WP 0157 00)
8.
Install light tower control panel key switch. (WP 0151 00)
9.
Install light tower control panel 125 volt breaker. (WP 0150 00)
10. Install light tower control panel toggle switches. (WP 0149 00)
11. Install light tower control panel main
circuit breaker
. (WP 0148 00)
12. Install light tower control panel twist lock outlet. (WP 0147 00)
13. Install light tower control panel duplex outlet. (WP 0146 00)
14. Install light tower control panel fuel gage. (WP 0145 00)
15. Install light tower control panel hour meter. (WP 0144 00)
16. Install light tower control panel. (WP 0160 00)
17. Install light tower battery negative lead terminal. (WP 0131 00)
18.
Perform operational check
of light tower. (TM 55-1945-205-10-4)
END OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business