Home
Download PDF
Order CD-ROM
Order in Print
LIGHT TOWER BALLAST BOX COVER - TM-55-1945-205-24-4_473
INSTALL LIGHT TOWER BALLAST - TM-55-1945-205-24-4_476
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
372
373
374
375
376
377
378
379
380
381
382
TM 55-1945-205-24-4
0158 00 2
0158 00
2.
Remove ballast box cover (3) from ballast box (2) and discard.
INSTALL LIGHT TOWER
BALLAST
BOX COVER
1.
Position new ballast box cover (3) over ballast box (2).
2.
Install nine hex head bolts (1) through
ballast
box cover (3) and tighten.
3.
Install light tower ballast box panel end. (WP 0157 00)
4.
Install light tower control panel key switch. (WP 0151 00)
5.
Install light tower control panel 125 volt breaker. (WP 0150 00)
6.
Install light tower control panel toggle switches. (WP 0149 00)
7.
Install light tower control panel main
circuit breaker
. (WP 0148 00)
8.
Install light tower control panel twist lock outlet. (WP 0147 00)
9.
Install light tower control panel duplex outlet. (WP 0146 00)
10. Install light tower control panel fuel gage. (WP 0145 00)
11. Install light tower control panel hour meter. (WP 0144 00)
12. Install light tower control panel. (WP 0160 00)
13. Install light tower battery negative lead terminal. (WP 0131 00)
END OF WORK PACKAGE
2
3
1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business