Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALL LIGHT TOWER DRAWBAR JACK - TM-55-1945-205-24-4_618
INSTALL LIGHT TOWER DRAWBAR CHAIN/HOOK ASSEMBLY - TM-55-1945-205-24-4_620
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
496
497
498
499
500
501
502
503
504
505
506
TM 55-1945-205-24-4
0201 00 1
0201 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER DRAWBAR CHAIN/HOOK ASSEMBLY
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Men’s and Women’s (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Materials/Parts
Chain/Hook Assembly
(33968)
PN 35610377
Personnel Required
Engineer 88L
REMOVE LIGHT TOWER DRAWBAR CHAIN/HOOK ASSEMBLY
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
1.
Using pliers, remove flex-link (1) securing chain/hook assembly (2) to bracket (3) on drawbar (4).
2.
Remove chain/hook assembly (2) from drawbar (3) and discard.
4
2
1
3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business