TM 55-1945-205-24-4
0201 00 1
0201 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER DRAWBAR CHAIN/HOOK ASSEMBLY
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Materials/Parts
Chain/Hook Assembly
(33968)
PN 35610377
Personnel Required
Engineer 88L
REMOVE LIGHT TOWER DRAWBAR CHAIN/HOOK ASSEMBLY
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
1.
Using pliers, remove flex-link (1) securing chain/hook assembly (2) to bracket (3) on drawbar (4).
2.
Remove chain/hook assembly (2) from drawbar (3) and discard.
4
2
1
3