TM 55-1945-205-24-40202 00 10202 00UNIT LEVEL MAINTENANCEFLOATING CAUSEWAYLIGHT TOWER OUTRIGGERREPLACEMENTINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 54, WP 0253 00)Gloves, Men’s and Women’s (Leather Palm) (Item 16, WP 0253 00)Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)Helmet, Safety (Brown) (Item 20, WP 0253 00)Life Preserver, Vest (Item 25, WP 0253 00)Materials/PartsOutrigger(33968)PN 36847713Pin, Outrigger(33968)PN 36848224Personnel RequiredSeaman 88KREMOVE LIGHT TOWER OUTRIGGERWARNINGAll personnel must wear personal flotation device, hard hat, safety shoes, and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.NOTEThe following procedure is typical for the removal and installation of both port and starboard light tower outriggers.1.Move screw (1) from outrigger (2).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business