TM 55-1945-205-24-4
0202 00 1
0202 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER OUTRIGGER
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Materials/Parts
Outrigger
(33968)
PN 36847713
Pin, Outrigger
(33968)
PN 36848224
Personnel Required
Seaman 88K
REMOVE LIGHT TOWER OUTRIGGER
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes, and
gloves during FC operations and maintenance. Failure to observe these precautions
could result in serious injury or death.
NOTE
The following procedure is typical for the removal and installation of both port and starboard
light tower outriggers.
1.
Move screw (1) from outrigger (2).