Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALL LIGHT TOWER - TOWER CROSS BAR - TM-55-1945-205-24-4_648
INSTALL LIGHT TOWER - TOWER ELECTRICAL CABLE SHROUD - TM-55-1945-205-24-4_650
TM-55-1945-205-24-4 Modular Causeway System (MCS) Floating Causeway FC-1 NSN 1945-01-473-2162 Manual
Page Navigation
522
523
524
525
526
527
528
529
530
531
532
TM 55-1945-205-24-4
0212 00 1
0212 00
DIRECT SUPPORT MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER - TOWER ELECTRICAL CABLE SHROUD
REPLACEMENT
INITIAL SETUP:
Tools
Tool Kit, General Mechanic’s (Item 53, WP 0253 00)
Gloves, Men’s and Women’s (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Materials/Parts
Shroud, Cable
(33968)
PN 36785822
Personnel Required
Engineer 88L
Equipment Condition
Telescopic Light Tower Assembly Lowered. (TM 55-1945-205-10-4)
REMOVE LIGHT TOWER - TOWER ELECTRICAL CABLE SHROUD
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
1.
Loosen outer stuffing tube coupling (1) until
junction box
electrical cable (2) can be slid off notch in shroud (3).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business