TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
STEERING SYSTEM MAINTENANCE
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Forward Repair System (FRS)
Three
Equipment Condition
Port hydrojet hatch opened and secured
Materials/Parts
(TM 5-1940-322-10).
Plastic 1/4 in. tubing
Funnel
Fill adapter 1/2"20
0031 00-1