• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE LOW OIL PRESSURE SWITCH REPLACEMENT - Continued
BATTERY JUMPER CABLE ASSEMBLY REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  243    244    245    246    247  248  249    250    251    252    253  
img
. . . . . .
TM 5-5420-226-20-3
BATTERY JUMPER CABLE ASSEMBLY REPLACEMENT (Sheet 1 of 6)
PROCEDURE INDEX
PAGE
PROCEDURE
10-245
Removal
10-248
Cleaning and Inspection
10-248
Installation
9/16 in. combination box and open end wrench (2 required)
TOOLS:
7/16 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
Grease GAA (Item 37, Appendix D)
SUPPLIES:
Rags (Item 65, Appendix D)
Steel wool (Item 56, Appendix D)
TM 5-5420-226-10
REFERENCE:
PRELIMINARY PROCEDURE
Remove three battery ground straps (page 10-264)
Go on to Sheet 2
TA168896
10-245






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.