• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT - Continued
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  329    330    331    332    333  334  335    336    337    338    339  
img
TM 5-5420-226-20-3
TM 5-5420-202-20-3
BASKET/CONTROL PANEL STARTING HARNESS REPLACEMENT (Sheet 3 of 5)
4.
Using 7/16 inch socket, remove top screw
(H), lockwasher (J), and washer (K) securing
strap (L) at three locations. Leave bottom
screw (M) installed.
5.
Using 7/16 inch socket, remove screws (N)
and lockwashers (P) securing clamps (Q) at
six locations.
6.
Using 7/16 inch socket, remove screw (R)
and lockwasher (S) securing clamp (T) at
vehicle floor and at handle (U) of purge
pump (V).
7.
Slip wiring harness (W) from behind
straps (L) and out of clamps (Q) and
(T) and remove from vehicle.
NOTE
The illustration below shows locations of harness
assembly supporting straps and clamps and the routing
of the harness assembly.
Go on to Sheet 4
10-295-.33
Change 6
6 31






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.