• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASKET/CONTROL PANEL POWER HARNESS REPLACEMENT - Continued
BASKET/CONTROL PANEL POWER HARNESS REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  325    326    327    328    329  330  331    332    333    334    335  
img
.
TMTM5420-226-20-3
5- 5-5420-202-20-3
BASKET/CONTROL PANEL POWER HARNESS REPLACEMENT (Sheet 3 of 4)
INSTALLATION:
1.
Route harness assembly (A) behind
retaining straps (B) and through clamps
(C), as shown. Using 7/16-inch socket, install
top screw (D), new lockwashers (E), and flat washers
(F) to secure strap (B) to crossbeam (G)
at three locations. Using 7/16-inch socket
install screws (H) and new lockwashers (J)
securing clamps (C) at six locations.
Go on to Sheet 4
Change 6
10-295-29
6. 7






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.