• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
VALVE BANK RETURN PORT FITTINGS REPLACEMENT (Sheet 2 of 3)
PUMP-TO-VALVE BANK HOSE ASSEMBLY (CW) REPLACEMENT (Sheet 1 of 2)

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  350    351    352    353    354  355  356    357    358    359    360  
img
.
TM 5-5420-228-24
VALVE BANK RETURN PORT FITTINGS REPLACEMENT (Sheet 3 of 3)
Using 12 inch adjustable wrench, install
6.
elbow (F) and collar "F" (G) into tee (E).
7.
Using 1-1/4 inch wrench, install hose
assembly "F" (H).
Using 12 inch adjustable wrench, install
8.
elbow (J) and collar "CR" (K).
Using 1-1/4 inch wrench, install hose
9.
assembly "CR" (L).
10.
Using 1-3/8 inch wrench, install nipple (M)
on tee (B).
11.
Holding nipple (M) with 1-3/8 inch wrench,
use 15 inch adjustable wrench to install
elbow (N) on nipple (M).
12.
Using 1-3/8 inch wrench, install nipple (P)
in elbow (N).
13.
While holding nipple (P) with 1-3/8 inch
wrench, use 1-5/8 inch wrench to install
collar "BB" (Q) and quick disconnect plug
(R) on nipple (P).
14.
Manually connect quick disconnect socket
"BB" (S) on plug (R).
15.
Bleed hydraulic system (page 3-72).
16.
Check for hydraulic leaks and correct as necessary.
17.
Service hydraulic reservoir (LO 5-5420-202-12).
End of Task
TA251585
3-188






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.