• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
VALVE BANK ASSEMBLY AND BRACKETS REPLACEMENT (Sheet 11 of 17)
VALVE BANK ASSEMBLY AND BRACKETS REPLACEMENT (Sheet 13 of 17)

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  622    623    624    625    626  627  628    629    630    631    632  
img
TM 5-5420-228-24
VALVE BANK ASSEMBLY AND BRACKETS REPLACEMENT (Sheet 12 of 17)
22.
Manually install two new preformed packings (AD) on two adapters (AE).
23.
Using 1-1/4 inch wrench, install two adapters (AE).
Using 1-1/4 inch wrench, install two adapters (AF).
24.
Manually install new preformed packing (AG) on nipple (AH).
25.
26.
Manually install nipple (AH).
Using pipe wrench to hold nipple (AH), use 1-1/4 inch wrench to tighten jamnut (AJ).
27.
Manually install new preformed packing (AK) on tee (AL).
28.
Manually install and aline tee (AL).
29.
Using adjustable wrench to hold tee (AL), use 1-1/4 inch wrench to tighten jamnut (AM).
30.
31.
Manually install new preformed packing (AN) on tee (AP).
Manually install and aline tee (AP).
32.
Using adjustable wrench to hold tee (AP), use 1-1/4 inch wrench to tighten jamnut (AQ).
33.
Manually install two new preformed packings (AR) on two adapters (AS).
34.
Using 1-1/4 inch wrench, install two adapters (AS).
35.
Go on to Sheet 13
TA251713
4-64






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.